吃奶呻吟打开双腿做受视频,色噜噜人体337P人体,亚洲国产成人久久综合下载,147大胆198人体毛片图

English中文簡體

新聞中心

表面處理——檢修口修復的基本概況 2021-05-10

五步法,簡單修復檢修口。

對于檢修口的修復,有五種基本技術選項:

? 水泥旋壓鑄造

? 聚氨酯噴霧

? 環(huán)氧噴霧

? 現(xiàn)成水泥

? 機械密封


Surface Preparation— a Fundamental Necessity for Manhole Rehabilitation


In the trenchless technology industry, we are both blessed and cursed with multiple technology options to solve essential problems. For manhole rehabilitation, there are five basic technology options:

? Cement Spincast

? Polyurethane Spray

? Epoxy Spray

? Formed-in-Place Cement

? Mechanical Seal


Get clarity on your objectives: mitigating infiltration and inflow (I&I), optimizing bench flow, restoring structural integrity, protecting against corrosion, or all the above. Choose wisely. Understand the process, validate service life expectancy and know who is performing the work because Execution is Everything.


No matter what technology or service provider you choose, nothing is more important than surface preparation to ensure longevity and prevent failures of a manhole restoration project. Nothing.


In preparing this article, investigations were made within NASSCO, SSPC, NACE, and ASTM organizations for the most current wisdom on surface preparation and learned an estimated 85 percent of coating failures are directly attributed to incorrect or inadequate surface preparation. This is one of the drivers behind the steady increase in the requirement for onsite inspection. Thorough surface preparation makes common sense, but not always common practice.


Without getting too deep into the five technology options and vendor attributes (bonded vs. unbonded, structural vs. non-structural, corrosion barrier or non-protected) it is highly recommended to follow vendor specific guidelines for surface preparation. The following five steps are fundamental for any manhole rehabilitation project, any technology, any technique:



Step 1 — Visual inspection of the substrate


In most cases, brick and mortar or precast concrete will be the surfaces that need prepared. A top-down view will reveal this, but to truly study the surface, there is no substitute to entering the structure for bottom-up investigation. Using a forensic approach, look for evidence of water stains, defects, physical damage, corrosion or chemical damage, contamination and excess moisture from the bench to the chimney.


Step 2 — Pressure washing



Pressure washing will reveal greater insight into the existing condition of the substrate. Low pressure water-blasting (4,000 to 5,000 PSI) is most common, but high-pressure (5,000 to 10,000 PSI) and high-pressure water jetting (up to 30,000 PSI) may be required. To remove previous failed material applied to the native substrate, more extreme measures include dry and wet abrasive blasting (reference SSPC-SP CAB 1-3)


Step 3 — Validate Substrate (brick or concrete)


An acceptable prepared surface should be free of contaminants, laitance, loosely adhering mortar, brick, or concrete, dust, and should provide a sound, uniform substrate suitable for the application of protective coating or lining system. (reference ASTM D4258)


Step 4 — Active Leak Correction (brick or concrete)



There are advantages and disadvantages for each of the following techniques with respect to sealing active leaks, but all rehab technologies make this a fundamental requirement.


? Injection Grouting: A hole is drilled into or near the leak site and urethane grout is injected to stop leak (older brick structures may require a more comprehensive curtain grouting technique)

? Hydraulic Cement: fast-setting mortar used to stop individual leaks (not recommended for brick structures)


Step 5 – pH Testing



pH Testing may not be required by all rehab technologies, but if so, there are three standard types of testing methods and one little known secret that is easy and inexpensive to administer:

? pH test paper

? Insta-check pH pencil

? pH meter

? Phenolphthalein—a weak, colorless acid sprayed onto a wet concrete surface. If no color is observed, the concrete surface is still acidic and additional surface preparation is necessary. If the solution turns pink in color, the pH value has reached approximately 8. At a pH of approximately 10 the solution turns a bright magenta.


No matter what technology or service provider you choose, nothing is more important than surface preparation to ensure longevity and prevent failures of a manhole restoration project. Nothing.


If you are truly interested in your manhole restoration project passing with flying colors, you’ll make certain that surface preparation is your number one priority, but only after choosing the technology, methodology, and service provider that best meets your rehab objectives. Thorough surface preparation is a fundamental necessity to the extended service life you expect of your manhole, maintenance hole, window to the collection system.


新聞中心 贊助商 合作媒體 下載中心 常見問題 友情鏈接
備案號:滬ICP備10040940號 電話:86-21-54791130 傳真:86-21-54791130 郵件:ITTC@CSTT.ORG, 版權所有 上??莆跷幕涣饔邢薰? 滬公網安備 31011702006209號 技術支持:攸攸網絡
国产日韩一区二区三区在线观看| 亚洲中文字幕无码不卡电影| 亚洲av永久无码一区| 国产高清在线精品一区| 成人欧美一区二区三区1314| 欧美一区二区三区性视频| 波多野结衣美乳人妻hd电影欧美 | 99久久人妻无码精品系列| 日本少妇春药特殊按摩3| 玩50岁四川熟女大白屁股直播| 无码人妻精品一区二区蜜桃百度| 18黑白丝水手服自慰喷水网站 | 国产午夜福利精品一区二区三区 | 日本人妻伦在线中文字幕| 国产乱子伦农村叉叉叉| 里番本子纯肉侵犯肉全彩无码| 美女大量吞精在线观看456| 福利视频一二三在线观看| 欧美午夜精品一区二区三区电影| 真实国产老熟女无套中出| 欧美性猛交xxxx乱大交丰满| 又大又粗又爽的少妇免费视频| 99久无码中文字幕一本久道| 久久精品国产网红主播| 大屁股熟女一区二区三区| 国产人澡人澡澡澡人碰视频 | 亚洲一区二区三区乱码在线欧洲| 久久久久久av无码免费看大片| 大地资源网高清在线播放| 国产手机在线αⅴ片无码观看| 末成年女av片一区二区| 精品久久人人妻人人做精品| 天天爽夜夜爽人人爽| 中文字幕人妻偷伦在线视频| 国产乱色国产精品播放视频| 国产农村乱子伦精品视频| 精品久久久久久久免费人妻| 国产精品一区二区 尿失禁| 国产精品成人免费视频网站京东| 国产国拍精品av在线观看按摩| 小鲜肉自慰网站|